| Start Timestamp | End Timestamp | Duration (hrs) | NPT Cause | NPT Description |
|---|---|---|---|---|
| Nov 11, 2013, 12:08 AM | Nov 11, 2013, 3:29 PM | 15 | Mud Loss (MLO) Wait on Weather (WOW) | Wait on Weather (WOW), Mud Loss (MLO). The drilling operations were suspended due to adver… |
| Nov 12, 2013, 5:47 AM | Nov 12, 2013, 1:52 PM | 8 | Stuck Pipe (STK) Repair (RPR) | Repair (RPR), Stuck Pipe (STK): string stuck at 2,110 m after connection; worked free, top… |
| Nov 13, 2013, 7:00 AM | Nov 14, 2013, 2:00 PM | 31 | Wait on Weather (WOW) | Heave exceeded rig limits; drilling suspended and the string hung off. |
| Nov 15, 2013, 11:30 PM | Nov 16, 2013, 1:00 AM | 1.5 | Repair (RPR) | Mud pump 2 fluid end swapped. |
| Nov 16, 2013, 6:00 AM | Nov 16, 2013, 10:00 AM | 4 | Equipment Failure (EQF) | MWD tool loss of signal; tripped to replace. |
| Nov 17, 2013, 8:00 AM | Nov 22, 2013, 4:00 PM | 128 | Wait on Weather (WOW) Well Control (WCT) | Storm system; well shut in and monitored, kick indication on resumption handled with 12.1 … |
| Nov 23, 2013, 3:00 AM | Nov 23, 2013, 8:00 AM | 5 | Supply Chain (SUP) | Waiting on casing delivery from the supply base. |
| Nov 24, 2013, 9:00 PM | Nov 25, 2013, 1:00 AM | 4 | Repair (RPR) | Iron roughneck hydraulic leak. |
| Nov 25, 2013, 6:00 AM | Nov 29, 2013, 2:00 AM | 92 | Stuck Pipe (STK) Fishing (FSH) | Differentially stuck at 3,460 m; jarred, backed off and fished the BHA. |
| Dec 1, 2013, 4:00 PM | Dec 1, 2013, 9:30 PM | 5.5 | Wait on Weather (WOW) | Crew change delayed by fog. |