Process Optimization Control RoomOpen Proposals 10Approved Changes 5Optimization Guardrails Active
Controls
What is this
Optimization Controls
Is Automated true
Sample Size Threshold 50
Last Updated Mar 5, 2024, 2:18 PM
What is this
Active Objectives
Minimize Cost
Minimize Time of Repair
Process Sequence Id Product ModelFaultObjectiveDate Proposed Status
P-100_F-1Hybrid A7Multiple Cylinder Misfire Detected TimeMar 6, 2024Open
P-100_F-1Hybrid A7Multiple Cylinder Misfire Detected CostMar 6, 2024Open
P-200_F-2ExcelLow Catalyst System Efficiency TimeMar 6, 2024Open
P-200_F-2ExcelLow Catalyst System Efficiency CostMar 6, 2024Open
P-400_F-4NatGas XLEngine Overheating TimeMar 6, 2024Open
P-400_F-4NatGas XLEngine Overheating CostMar 6, 2024Open
P-500_F-5Neutro 11Faulty Fuel Vapor Emissions TimeMar 6, 2024Open
P-500_F-5Neutro 11Faulty Fuel Vapor Emissions CostMar 6, 2024Open
P-600_F-6S1700Check Engine Light On TimeMar 6, 2024Open
P-600_F-6S1700Check Engine Light On CostMar 6, 2024Open